Other - Green Building
Framework of demonstration and dissemination of very innovative and cost-effective energy efficiency technologies for the achievement of very low energy new buildings
This framework is based in three pillars:
Three new buildings will be used as pilots, deploying in each one a set of very innovative measures, constructive elements for energy optimization, high efficient equipment and advanced energy management. All the above allows to enhance the overall energy efficiency of the building in order to achieve consumption (primary energy) lower than 60 kWh/(m2yr).
It is expected an important impact in building sector, in particular in new buildings, in the following four main areas:
CARTIF | DRAGADOS | Fraunhofer IBP | FACIT | Domagk Gewerbepark | 1A Ingenieros | Studio Lucchin | EnginSoft | youris.com

Funding Scheme FP7 Collaborative Project | Call identifier EeB.ENERGY.2011.8.1-1
4 years
January 2012 - December 2015
EnginSoft Spa
Angelo Messina
11
Some of our competences in research and technology transfer

Research project
The main aim of the project is to set out the knowledge and skills that a competent simulation engineer (CAE engineer) should possess, and to develop a set of tools that will enable engineers to develop, manage and certify their competencies within a wide range of industry sectors.

Research project
Production of components made of composite material, equipped with wireless communication systems capable of operating correctly in environments hostile to radio frequency.

Research project
The ReCaM-project demonstrates at TRL 7 a set of integrated tools for the rapid and autonomous reconfiguration of agile production systems